Out of Character Thread 5
I'll talk to Timber about additional work on the ship that can be done over the next five days.
1) Gangway that can be extended/retracted from the ship.
2) Shields that can be temporarily fitted along the sides to give any guards we have a little extra protection.
3) Assessment of the spars, masts, and other wooden parts of the rigging to see what needs to be replaced. Actually, why does a ship that flies on magic even have rigging?
4) Get an estimate (price and time) for a cargo crane to move cargo (and giant metal crabs) to and from the ship.